GDF SUEZ Energy Romania
Okaloosa Gas District: Infrastructure Management
Kansas City Board of Public Utilities: Electrical Distribution
Anchorage Municipal Light & Power
Swissgrid Transmission System Operator: Switzerland

North East Water: Victoria, Australia
Tokyo Electric Power Services Co.
Los Angeles Department of Water and Power
Plymouth County, Iowa, USA
York Region, Ontario, Canada
Rushmoor Borough Council, England
Industrielle Werke Basel
Stadtwerke Augsburg
ÜZ Lülsfeld
City of Chur
Kabel BW: Cable Company (Germany)
LIWEST Kabelmedien GmbH
MidCoast Water (Australia)

A modern network information system must support the entire range of network operator processes—from planning to construction and the documentation of inventory to quick and efficient directory services. The system in use at Kabel BW—in full, Kabel Baden-Württemberg GmbH & Co. KG—no longer met these requirements.
Following a project tender, the company decided in September 2008 to opt for Autodesk® Topobase™ software and FNT’s Command. The scope of supply of the two software packages is perfectly balanced: Autodesk Topobase models the location and status of the networks and their components, while Command is used to manage the entire network inventory. A key consideration was achieving the greatest possible data continuity—meaning that ideally the relevant data for any work process should be available at the press of a button, so to speak, without any redundant data storage.
The entire project was completed in some 12 months, with the new network information system in production since May 2010. Autodesk Consulting acted as prime contractor and coordinated the other software suppliers and service providers as well as the Kabel BW departments involved. The first positive effects are on the horizon; they range from a noticeable improvement in network planning processes and in information services to precise valuation of assets.
A geographic information system was required with the prime function of locating components of the network—but this alone was not sufficient. The desired functionality of NIS 2.0, Kabel BW’s network information system, included supplying information on equipment in installations rooms and the ability to capture highly detailed technical data. Autodesk and FNT-GmbH from Ellwangen near Stuttgart, therefore, collaborated to offer a joint solution based on standard oftware and giving Kabel BW the best of two worlds: on the one hand, the Autodesk Topobase geospatial data management technology, Autodesk Topobase Web—including Autodesk MapGuide® software as a planning and information system—plus AutoCAD® Raster Design software for processing the scanned data, and on the other hand FNT’s Command software suite for managing the network inventories.
A new systems interface was implemented to facilitate a smooth exchange of data between the two systems. This interface was the only software that had to be developed from scratch—entirely in keeping with Kabel BW’s guidelines. Project manager Ulrich Hoffmann explains: “We didn’t want to make ourselves dependent on customized programming. Therefore we looked for solutions which could be adapted to our requirements solely through configuration. Moreover, the technical tasks should be kept strictly apart: redundant data storage is an absolute ‘no go.’” Autodesk and FNT fulfilled these criteria as well as all further requirements: the total package is web-based; the software companies are flexible, financially sound partners who are also willing to fulfill non-standard demands; and the respective contacts are in the vicinity of the customer. The role of prime contractor was carried out by Autodesk Consulting, whose team had to accommodate the needs of many parties:
The migration of the inventory data began 6 months after project start. Approximately 1.5m conduit nodes and 160,000 conduit segments were migrated in the coax division. Then the old system was switched off and staff began to use NIS 2.0. During this pilot phase performance was optimized, processes were improved and errors were corrected. Since the new system is considerably more comprehensive than the old, a vast amount of data has to be re-entered initially. This applies both to technical data and to plans. “We have actually scanned in most of the paper plans, but in order to use them properly, we have to create GIS objects in Autodesk Topobase and inventory in FNT Command,” explains Ulrich Hoffmann. “We can use the raster data as a template, but automatic vectorization is not possible, since we use the opportunity to check the factual accuracy of every plan. This takes time, but pays off in the end.”
Kabel BW staff are no longer confronted by the dilemma of whether to work with Autodesk Topobase or with FNT, as NIS 2.0 presents a unified interface. The workflow between the two systems is perfect: You can start with a geographical location, such as a conduit node—therefore starting with Autodesk Topobase—and have the technical data on a component of the cable infrastructure, such as a house connection, displayed. Or you begin with the information on an infrastructural element—in Command—and get to the exact point of installation with a single click. The first improvements are slowly showing, but Ulrich Hoffmann is convinced that efficiency at Kabel BW will improve noticeably in the coming months. “NIS 2.0 is helping with all our processes. From planning to implementation and on to documentation—we are already seeing distinct improvements. Above all, we are getting continuous and high-quality network documentation.” Such documentation helps to locate and address network problems more easily. “Third parties can view detailed information about the network online, without the red tape. Thus, you know from the beginning where our cables are located, and can get your excavator in the right spot.” Ultimately, financial controlling will also benefit from the new system: “We can evaluate our assets more easily and more accurately, precisely because everything is available in a single database.” |
| Kabel BW Customer Story (pdf - 249Kb) |