Project Summary
Founded in 1864, McCarthy Building Companies, Inc. is one of the oldest privately owned construction firms in the United States—and it shows. A true builder, McCarthy brings intimate knowledge of the construction process to every job, earning its reputation for delivering high-quality projects safely, on time, and on budget. When McCarthy started a complex physical sciences building project for Cornell University, the company and its subcontractors had just begun exploring the power of Autodesk® Navisworks® Manage software for model coordination. Even so, McCarthy knew that this level of coordination would prove integral in the face of the project’s challenging site and complex mechanical systems. From preconstruction planning though construction and inspections, Navisworks Manage software helped facilitate nearly every aspect of McCarthy’s work on the project. With help from Navisworks Manage, McCarthy was able to:
The Challenge
McCarthy needed to build a 195,331-square-foot physical sciences facility in a space surrounded by 3 existing Cornell buildings. The structure would contain more than 100 physics and chemistry labs, supported by complex mechanical, electrical, and plumbing (MEP) systems that would have to tie into existing systems in an adjacent building. "Our single biggest challenge was coordinating construction," explains Fran Birdsall, senior project manager at McCarthy. "We had to place a highly complex, low-vibration structure very precisely on the site. It was exponentially more complicated than building a structure in the middle of a field."
Although the project wasn’t designed in 3D and its subcontractors had limited experience with it, McCarthy believed that doing 3D coordination was the only way to deliver a quality building with little rework. "We knew there would be a steep learning curve for subcontractors, but the payoff would be worth it," says Birdsall.
The Solution "The model let us visualize the architecture holistically," says Birdsall. "The architect could view wall elevations and better understand the integration of research equipment and utilities. Together, we worked through the building virtually, solving both architectural and mechanical coordination problems." |
3D Model Drives Prefabrication and Preconstruction Reviews
In fact, reviewing the design for constructability on a large screen helped McCarthy avoid problems during construction—and helped to save Cornell money. For example, the team realized that the complex mechanical systems simply wouldn’t fit into the ceilings as designed. "We had ceiling problems on nearly every floor," says Alyssa Thomas-Partridge, who managed the coordination process and Navisworks model. After the ceilings were adjusted to fit the systems, the team discovered that one ceiling was too low to meet OSHA requirements. "If we were working in 2D, we probably wouldn’t have discovered the problem until inspection," Thomas-Partridge says. "If we’d had to correct the issue after construction, it would have cost $56,000 in rework."
Not only did viewing the model in Navisworks Manage help McCarthy with constructability issues, it helped the firm tackle one of the project’s biggest challenges: integrating new and existing systems. "It was one of the best uses of Navisworks on the project," says Thomas-Partridge. "We modeled every connection point and discovered many problems we were able to resolve before walls went up."
In addition, McCarthy and its subcontractors were confident enough in the project model’s accuracy and the coordination capabilities of Navisworks that they prefabricated several systems, including a pump skid in the penthouse. "We prefabricated everything we could," says Birdsall. "It let us build in a controlled shop environment and have things ready when we needed them on-site, helping to advance the schedule."
Navisworks in the Field
During construction, McCarthy loaded field staff’s tablet PCs with the model, PCOs, RFIs, submittals, project specifications, and drawings. Subcontractors hosted daily toolbox talks for workers, using Navisworks fly-throughs to help plan each day’s tasks. The result: improved quality and efficiency. Having the model and associated information on hand also supported on-site coordination. For example, on-site fly-throughs helped mason and drywall subcontractors see how they would interface with MEP systems and where they should install penetrations.
McCarthy relied on the models to help make sure work would pass inspection. To check fire caulking, McCarthy created PDFs of all systems, highlighting rated walls, then loaded the PDFs onto tablets for subcontractors to take into the field. "They could more easily see what walls were rated and needed to be fire caulked," explains Thomas-Partridge. "As a result, we were on the same page as the inspector."
Teams also checked completed work against the model. In one case, McCarthy found a Phoenix valve installed in the wrong location. "We took it out and installed the correct one before inspection, which was significant as it would have otherwise set back the schedule," says Birdsall.