"BIM helped the entire project team communicate and collaborate more effectively, and ultimately deliver the arena ahead of schedule and under budget."
—Aaron Wright, BIM Coordinator, Robins & Morton
Founded in 1946, Robins & Morton has grown from a modest construction operation into one of the top contractors in the United States. Its services include general construction, construction management, program management, preconstruction, and design-build. A progressive leader in sustainable construction, Robins & Morton incorporates green building practices in many of its projects. The company’s major divisions—Healthcare, Commercial, Special Projects, Concrete/Industrial, and Government Services—operate from six offices throughout the southeastern United States.
For the past 4 years, Robins & Morton has used Building Information Modeling (BIM) to foster close collaboration with building owners, designers, and subcontractors from the earliest stages of planning. The company uses Autodesk BIM Solutions to assist in identifying and addressing constructability issues before they happen, helping them exceed customers’ expectations with more streamlined schedules and greater cost savings. The firm has successfully constructed more than 35 projects using Autodesk BIM solutions.
The Solution |
During preconstruction, Robins & Morton used Autodesk® Revit® software to help develop construction models of the arena, enhancing the design team’s Autodesk® Revit® Architecture and Autodesk® Revit® Structure models and using original 2D design data. The company then aggregated those models using Autodesk® Navisworks® Manage software to help improve cross-discipline design and preconstruction coordination.
Avoid Waste |
Throughout the project, Robins & Morton relied on Navisworks Manage software for 4D construction planning, linking the consolidated Autodesk Navisworks model to the project schedule to simulate construction. Due to the site’s space constraints, this was especially crucial for the large cranes that hoisted the long-span roof trusses from within the bowl of the arena.
Robins & Morton used Revit Architecture software to help create models of the actual construction cranes used on the project, and then imported those crane models into the consolidated Navisworks model. "By visualizing the lift and swing radii for each crane, the team coordinated the crane’s entry, exit, and travel paths with the erection activities of the precast seating and roof trusses," says Ranger. "This preplanning helped save us valuable time, especially as we got closer to dry-in—when the space above the cranes was limited, but the cranes still needed clearance to move and exit."
Streamline Design-Build "Although the arena itself was new construction, the museum was more like a renovation project," says Wright. "The university and the museum designers could study the museum design model to help them see if it met the university’s needs and expectations." In addition, Robins & Morton used Navisworks Manage software to better understand the museum’s construction implications and to help make sure it did not jeopardize the overall project schedule. "With Navisworks we could visualize the whole area—including the building's systems and structural elements—and we quickly discovered a major problem," says Ranger. "There was no easy way to provide the many steel, electrical, data, fire protection, and HVAC feeds to the free-standing museum walls and exhibits components once the structure was completed." With help from Navisworks Manage software, the team identified alternate methods for routing the necessary systems to the interior exhibit space. "By finding and fixing these issues digitally, we successfully demonstrated that the museum construction could move forward without impacting the schedule of the base contract or the cost of the museum," says Ranger. |
Robins & Morton used Revit Structure software as its primary documentation tool for concrete placement during construction. The team started with the Revit structural concrete design model and modified the model elements (dividing multistory concrete columns, for instance) to more accurately and graphically represent construction activities.
"In one instance, we used the software to plan and document construction activities for more than 200 foundation caissons, tracking date poured, volume of concrete, and depth at refusal," recalls Wright. "This helped us compare and visually monitor design depth quantities versus actual depths—resulting in a credit of more than US$300,000 for our client."
As construction proceeded, Robins & Morton updated the Revit Structure model with installed dates and regularly exported it to the Navisworks model. "Using the Navisworks 4D simulation functionality, we watched side-by-side comparisons of planned versus as-built schedules, which helped give us valuable insight for our future scheduling efforts," says Wright.
Enhance Project Understanding For their monthly progress meetings, the team created visualizations in the form of renderings or shaded views. These "project snapshots" were often combined with photographs of the construction in order to document scheduled versus actual progress. "This helped give all the meeting participants a better understanding of the project’s status," says Ranger. "In addition, these snapshots helped enable quicker turnaround times by the owner on the contractors’ applications for payment." Project visualizations were also valuable for sponsor recruitment. "We imported the logos of key potential sponsors into the Revit model to create high-end renderings of the arena, to help show them the impact of their sponsorship," says Wright. And throughout the project the university used Navisworks walk-throughs and animations to help give player recruits and donors a virtual tour of the arena and its amenities. Finally, Robins & Morton used the Navisworks model and virtual walk-throughs in a variety of public outreach efforts to help explain and promote both the arena and the use of BIM to local organizations, Auburn University students and alumni, and industry groups. |
Robins & Morton used laser scanning to generate as-builts of the stadium in order to coordinate the fabrication and installation of the stadium seating. "There are a lot of potential code issues with precast versus cast-in-place concrete construction, as was the case with the arena’s precast stadia and its cast-in-place stair treads," explains Ranger. "So we scanned the entire bowl in less than two hours and then imported the point cloud data into Navisworks. By overlaying the point cloud and the design model, we were better able to identify where the spacing from tread to tread was out of tolerance and where the as-built stadia would not accommodate the as-designed seating count."
With help from Navisworks Manage and laser scanning, Robins & Morton detected and dealt with the issues before the delivery of the seating, saving their client both time and money during installation.
The Results |
Learn more about Autodesk BIM Solutions.
"On complex projects like this, BIM enables us to more efficiently manage the phases of preconstruction and construction, and it helps drive our lean construction practices."
—Aaron Wright, BIM Coordinator, Robins & Morton
| Robins & Morton Customer Story (pdf - 2235Kb) |